The merchandise nicely displays environmental defense and power conserving. We can source a total-selection of electricity transmission products like chains, sprockets and plate wheels, pulleys, gearboxes, motors, couplings, gears and racks. Our solution assortment also covers locking assemblies (clamping aspects/locking device), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, common joint, rod finishes and yokes. WPC Crust Foam Board ExtruEPTTEPTT Line with Ce and ISO
Specs
one, EPTT WPC Board EPTT
two, Thickness: 3-30mm
3, Width: 1220mm
4, CE, ISO9001
Main EPTnique Parameter
1, Conical double screw extruEPTTSJSZ-eighty/156
A) Output: three hundred-400kg/h
B) EPTT technique:
EPT torque output vertical EPTT EPT box
Framework: Vertical
Offered with outdoors-circulation cooling system
EPTTorted thrust bearing and large-torque output
EPT of EPT: 20CrMnTi, with EPT grinding specialized remedy and cementite
two. Mould
A) Construction: EPT design for PVC WPC board
B) Width of die: 1400mm
C)Thickness: twelve-20mm
D) EPT: 5CrNiMo, higher quality alloy
3, Vacuum calibrating and forming desk
Max. Calibrating width: 1450mm
Calibrating desk duration: 2000mm
Vacuum pump EPTT: 5.5kw*two models
Max. Exhausting volume: 80m3/min
EPT EPTT: 4kw
four, Cooling bracket
A) Overall size of roller bracket 5000mm
B) Cooling Roller
Diameter: Oslash 63mm
Length: 1320mm
5, Haul-off device
Max. Pulling width: 1450mm
Max pulling thickness: 20mm
Pair roller qty: seven pairs
Pushed motor EPTT: five.5kw
six, Transverse cutting bracket
Rack type synchronize pressing unit
EPT layout flat slicing motor: 2.2kW
With non-pole cylinEPTTleft and rigEPTT relocating system
AuXiHu (West EPT) Dis.liary EPTTs
Elements | Amount |
1,SWP450 Crusher | 1 set |
2 500/1000 Mixer | one established |
3,EPTP600 Chiller | 1 set |
4,Air EPTT | 1 established |
EPT Terms
- Payment Phrase: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be appropriate
- Shipping Time: forty daEPTTafter receipt of prepayment.
- EPTT Approach: EPTT film or wood scenario
- Confirmed Time: 12 months
EPTTRUNNING Take a look at AND After Services
- When EPTT completed, we will invited consumer come to our manufacturing facility to check the EPTT and do the EPTT test. If EPTT is ok, then shopper pay out for the harmony. And inspect EPTT load the container.
- When EPTT comes client’s manufacturing facility, if shopper needs, we will send out one-2 engineer to client’s manufacturing facility do the EPTT installation and managing examination, and also prepare the neighborhood worker how to operate and sustain the EPTT. It is chargeable.
- If have any issue or issue on EPTT procedure or maintain, welcome to contact to us by electronic mail or calling. We stand by 24 hrs.